• Email Us: [email protected]
  • Contact Us: +1 718 874 1545
  • Skip to main content
  • Skip to primary sidebar

Medical Market Report

  • Home
  • All Reports
  • About Us
  • Contact Us

Congo’s $6 billion China mining deal ‘unconscionable’, says draft report

October 8, 2021 by David Barret Leave a Comment

October 8, 2021

By Aaron Ross and Helen Reid

DAKAR (Reuters) – Democratic Republic of Congo should renegotiate its $6 billion infrastructure-for-minerals deal with Chinese investors, according to the draft of a report commissioned by a global anti-corruption body of governments, companies and activists.

The draft, seen by Reuters, describes the deal that was first signed in 2008 as “unconscionable” and urges Congo’s government to cancel an amendment signed secretly in 2017 that sped up payments to Chinese mining investors and slowed reimbursements of investment in infrastructure.

The final report is expected to be released this month by the Extractive Industries Transparency Initiative (EITI), which tracks revenue flows in the oil and mining sectors and counts more than 50 countries, including Congo, as members.

The report has no legal force but, if the draft’s main conclusions remain, it could bolster Congo’s push to secure more favourable terms from mining contracts with Chinese investors.

President Felix Tshisekedi’s government is reviewing the 2008 contract and the reserve levels at China Molybdenum’s Tenke Fungurume mine after saying Congo was not getting a fair deal.

Prime Minister Sama Lukonde Kyenge told a mining conference on Thursday: “There has to be some adjustment.”

The moves represent rare pushback by Congo, the world’s leading producer of the battery metal cobalt and Africa’s top copper miner, against the Chinese investors who control most of its mining industry.

Under the 2008 deal struck with the government of former President Joseph Kabila, Chinese state-owned firms Sinohydro Corp and China Railway Group Limited agreed to build roads and hospitals financed by profits from Congo’s Sicomines cobalt and copper joint venture.

Critics say few of those projects have been realised.

Congo’s government spokesman said he had not read the draft and could not comment. EITI’s office in Congo referred Reuters to the terms of reference of the mission and declined to comment further. A Sicomines representative did not respond to requests for comment.

China Railway had no immediate comment. Sinohydro did not respond to a request for comment.

Fred Zhang, a senior Sicomines official, defended the deal in comments to Reuters last week, saying it had driven development for Congo’s people and Sicomines would disburse more funds as production rose.

‘DENUNCIATION’

The draft, written by two Congolese consultants, recommends “the denunciation by the Congolese state of the unconscionable character of the joint-venture convention of April 22, 2008 and the return to the negotiations table by Sicomines shareholders”.

It says the Chinese companies’ 68% stake in Sicomines is too high since the Congolese contributed all the mining assets and 32% of the initial capital.

It condemns the previously undisclosed 2017 amendment.

Under the 2008 contract, all of Sicomines’ profits would initially go to reimbursing investments in Congo’s most urgent infrastructure projects. It was on that basis that parliament agreed to exempt Sicomines from all taxes, the draft says.

Under the 2017 amendment, seen by Reuters, only 65% of Sicomines’ profits must initially go toward reimbursing the investments while 35% goes to shareholders.

The change could further slow the pace of the infrastructure projects, the draft says. To date, less than $1 billion of the expected $3 billion has been invested, about $1 billion less than projected at this stage, it says.

“This amendment constitutes a violation of the security of the interests of the Republic,” the draft says.

The draft report calls for re-evaluating Sicomines’ reserves, saying a 2010 feasibility study 2010 was flawed, and cancelling another contract with the same Chinese investors to build a hydroelectric dam.

(Reporting by Aaron Ross in Dakar and Helen Reid in Johannesburg; Additional reporting by Sophie Yu in Beijing; Editing by Edmund Blair)

Source Link Congo’s $6 billion China mining deal ‘unconscionable’, says draft report

David Barret
David Barret

Related posts:

  1. IMF says crucial Chad gets debt treatment deal with private creditors
  2. Asian shares at 1-month low, default fears stalk China Evergrande
  3. Allianz speeds up succession planning in light of Structured Alpha lawsuits
  4. World Bank cuts Thai GDP growth outlook to 1% this year

Filed Under: News

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

  • The Bizarre 1997 Experiment That Made A Frog Levitate
  • There’s A Very Good Reason Why October 1582 On Your Phone Is Missing 10 Days
  • Skynet-1A: Military Spacecraft Launched 56 Years Ago Has Been Moved By Persons Unknown
  • There’s A Simple Solution To Helping Avoid Erectile Dysfunction (But You’re Not Going To Like It)
  • Interstellar Object 3I/ATLAS May Be 10 Billion Years Old, This Rare Spider Is Half-Female, Half-Male Split Down The Middle, And Much More This Week
  • Why Do Trains Not Have Seatbelts? It’s Probably Not What You Think
  • World’s Driest Hot Desert Just Burst Into A Rare And Fleeting Desert Bloom
  • Theoretical Dark Matter Infernos Could Melt The Earth’s Core, Turning It Liquid
  • North America’s Largest Mammal Once Numbered 60 Million – Then Humans Nearly Drove It To Extinction
  • North America’s Largest Ever Land Animal Was A 21-Meter-Long Titan
  • A Two-Headed Fossil, 50/50 Spider, And World-First Butt Drag
  • Interstellar Comet 3I/ATLAS Is Losing Buckets Of Water Every Second – And It’s Got Cyanide
  • “A Historic Shift”: Renewables Generated More Power Than Coal Globally For First Time
  • The World’s Oldest Known Snake In Captivity Became A Mom At 62 – No Dad Required
  • Biggest Ocean Current On Earth Is Set To Shift, Spelling Huge Changes For Ecosystems
  • Why Are The Continents All Bunched Up On One Side Of The Planet?
  • Why Can’t We Reach Absolute Zero?
  • “We Were Onto Something”: Highest Resolution Radio Arc Shows The Lowest Mass Dark Object Yet
  • How Headsets Made For Cyclists Are Giving Hearing And Hope To Kids With Glue Ear
  • It Was Thought Only One Mammal On Earth Had Iridescent Fur – Turns Out There’s More
  • Business
  • Health
  • News
  • Science
  • Technology
  • +1 718 874 1545
  • +91 78878 22626
  • [email protected]
Office Address
Prudour Pvt. Ltd. 420 Lexington Avenue Suite 300 New York City, NY 10170.

Powered by Prudour Network

Copyrights © 2025 · Medical Market Report. All Rights Reserved.

Go to mobile version