• Email Us: [email protected]
  • Contact Us: +1 718 874 1545
  • Skip to main content
  • Skip to primary sidebar

Medical Market Report

  • Home
  • All Reports
  • About Us
  • Contact Us

Emirates slams Boeing over 777X delays

October 5, 2021 by David Barret Leave a Comment

October 5, 2021

By Tim Hepher

Boston (Reuters) -The head of Dubai airline Emirates piled pressure on planemaker Boeing on Tuesday over delays to its 777X jetliner, warning that the uncertainty would cause significant disruption for one of the world’s biggest carriers.

Emirates President Tim Clark said he wanted “another grown-up conversation” with the U.S. planemaker over the timing of the twin-engined jumbo, which is running at least two and a half years behind its originally planned arrival of June 2020.

“We work to precision. I struggle with others who can’t get that,” Clark told reporters shortly before he was due to meet Boeing leaders on the sidelines of an airline industry summit.

Clark, an airline industry veteran who was closely involved in the development of the current 777-300ER model, has lambasted Boeing this year over repeated delays to its 777X.

Boeing had no immediate comment when contacted by Reuters.

The company has previously said it plans to start delivering the new, larger version of the 777 wide-body jet by late 2023, three years later than originally planned, partly owing to a longer certification process after fatal 737 MAX jet crashes.

Clark, who is taking part in an International Air Transport Association meeting in Boston, emphasised that the uncertainty over Boeing’s progress with the programme would hamper his airline’s complex fleet plans.

Emirates, which has 126 777X jets on order, is a launch customer for the new aircraft that will replace the current 777 jets that are the backbone of its wide-body fleet.

Clark said that Emirates still did not know when the first 777-9 version of the twin-engine jumbo would arrive, nor whether the smaller 777-8 version would be built at all.

In May Clark said that Emirates would refuse delivery of 777X jets that did not meet contractual agreements. On Tuesday he said he would like industry contracts to be altered to make manufacturers more liable for the knock-on effects of delays.

Currently maufacturers are liable for product defects, not indirect “consequential damages” such as passenger compensation.

In April the airline’s chairman said that some of the 126 777X jets ordered could be swapped for smaller Boeing 787 Dreamliners.

Emirates has already revised its order for the 777X in 2019, cancelling orders for 24 of the jets as part of a deal that saw it agree to buy 30 Dreamliners.

Asked on Tuesday whether Emirates could swap more 777X planes for the smaller 787, Clark said much would depend on Boeing.

(Reporting by Tim HepherWriting by Alexander CornwellEditing by David Goodman)

Source Link Emirates slams Boeing over 777X delays

David Barret
David Barret

Related posts:

  1. Mexican president’s legal counsel steps down, ally to step in
  2. The best PlayStation Classic prices and sales for September 2021
  3. Adobe jumps into e-commerce payments business in challenge to Shopify
  4. Investors with $4 trln assets aim to tackle Asian firms on climate change goals

Filed Under: News

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

  • Why Is There No Nobel Prize For Mathematics?
  • These Are The Only Animals Known To Incubate Eggs In Their Stomachs And Give “Birth” Out Their Mouths
  • Constipated? This One Fruit Could Help, Says First-Ever Evidence-Led Diet Guidance
  • NGC 2775: This Galaxy Breaks The Rules Of “Galactic Evolution” And Baffles Astronomers
  • Meet The “Four-Eyed” Hirola, The World’s Most Endangered Antelope With Fewer Than 500 Left
  • The Bizarre 1997 Experiment That Made A Frog Levitate
  • There’s A Very Good Reason Why October 1582 On Your Phone Is Missing 10 Days
  • Skynet-1A: Military Spacecraft Launched 56 Years Ago Has Been Moved By Persons Unknown
  • There’s A Simple Solution To Helping Avoid Erectile Dysfunction (But You’re Not Going To Like It)
  • Interstellar Object 3I/ATLAS May Be 10 Billion Years Old, This Rare Spider Is Half-Female, Half-Male Split Down The Middle, And Much More This Week
  • Why Do Trains Not Have Seatbelts? It’s Probably Not What You Think
  • World’s Driest Hot Desert Just Burst Into A Rare And Fleeting Desert Bloom
  • Theoretical Dark Matter Infernos Could Melt The Earth’s Core, Turning It Liquid
  • North America’s Largest Mammal Once Numbered 60 Million – Then Humans Nearly Drove It To Extinction
  • North America’s Largest Ever Land Animal Was A 21-Meter-Long Titan
  • A Two-Headed Fossil, 50/50 Spider, And World-First Butt Drag
  • Interstellar Comet 3I/ATLAS Is Losing Buckets Of Water Every Second – And It’s Got Cyanide
  • “A Historic Shift”: Renewables Generated More Power Than Coal Globally For First Time
  • The World’s Oldest Known Snake In Captivity Became A Mom At 62 – No Dad Required
  • Biggest Ocean Current On Earth Is Set To Shift, Spelling Huge Changes For Ecosystems
  • Business
  • Health
  • News
  • Science
  • Technology
  • +1 718 874 1545
  • +91 78878 22626
  • [email protected]
Office Address
Prudour Pvt. Ltd. 420 Lexington Avenue Suite 300 New York City, NY 10170.

Powered by Prudour Network

Copyrights © 2025 · Medical Market Report. All Rights Reserved.

Go to mobile version